PERANCANGAN ECONOMICAL BALANCE DONGKRAK ULIR ELEKTRIK DWI HASTA

Authors

  • Muhammad Dimas Ferdiansyah Program Studi Teknik Mesin, FTI, ITATS
  • Sukendro Sasongko Program Studi Teknik Mesin, FTI, ITATS

DOI:

https://doi.org/10.26740/otopro.v18n2.p54-58

Keywords:

electrical screw jack, manufacturing system, economic value

Abstract

The Dwi Hasta lifting crew jack is a tool that assist the car maintenance mechanician. It tool support the car at an elevation
for the maintenance working and lay it down after the mechanician done. The objective of study is to obtain the cost of the
manufacturing from production stage to selling. In which, it device is for assisting the mechanician repaired a car. Manufacture system would obtain economic values and production time at one unit. The investigation is started from design, and to the manufacturing system. Regards to the planning of the manufacturing, the production cost, the selling cost, and time of refund are obtained at the cost calculation. The money refund is the production cost will get after selling. The experiment method is conducted at operating process chart (OPC), manufacturing lead time (MLT), production time, production flow, production capacity and break event point (Q). The experiment results showed economic value from raw material to one-unit machine. MLT is of about 53,83 hours. Production time performs is for 346,7 min. Production capacity is 6 units per month. Break Event Point (Q) will be started after 3 months. The profit taking back is Rp 6.181. 964. Money will be payback after 3 month

References

N. I. Akbar, “Modifikasi Dongkrak Mekanik Menjadi Elektromekanik Kapasitas 2 Ton,” Univ. Pas., p. 37, 2016.

S. Islami and M. R. Fauzi, “Modifikasi Dongkrak Ulir Botol Menggunakan Motor Listrik,” J. Surya Tek., Vol. 9, no. 1, pp. 365–369, 2022, doi: 10.37859/jst.v9i1.3769.

M. Masshuri, “Modifikasi Dongkrak Screw Mekanis Menjadi Dongkrak Screw Elektrik Kapasitas 1 Ton Menggunakan Wireless Remote Control,” Mechonversio Mech. Eng. J., Vol. 2, No. 2, p. 63, 2020.

S. Ahmad., N. Tanti, dan T.G. Pandoyo. Perencanaan Gearbox dan Perhitungan Daya Motor pada Modifikasi Dongkrak Ulir Mekanis Menjadi Dongkrak Ulir Elektrik, Vol. 4 No. 2, 2013. Politeknik Negeri Balikpapan. Diakses 16 Maret 2021.

Cahyo., dan Sutowo. Analisa Dongkrak Ulir Dengan Beban 4000 kg. 2021. Universitas Muhammadiyah Jakarta. Diakses 15 Maret 2021.

M. Adek Ricky, T. Jhonnaidi, G. Tjahjono, dan I. Fahmi. Rancang Bangun Dongkrak Elektromekanik Menggunakan Motor Dc Berbasis Arduino Vol. 4 No. 1. 2019. Univ.Nusa Cendana. Diakses 28 Agustus 2021.

S. Ahmad S., N. Tanti, dan T.G. Pandoyo. Perencanaan Gearbox dan Perhitungan Daya Motor pada Modifikasi Dongkrak Ulir Mekanis Menjadi Dongkrak Ulir Elektrik, Vol. 4 No. 2, 2013. Politeknik Negeri Balikpapan. Diakses 16 Maret 2021.

D. Setiawan. Sistem kontrol motor DC menggunakan PWM berbasis Arduino. Vol. 15 No. 1, 2017. Universitas lancang kuning,. Diakses 23 Juli 2021.

R. M. Wattimena, A. S. Ardjo, Hartono, and A. S. Alfauzi, “Analisa Proses Manufaktur Di PT MAJ Sebagai Upaya Penyelarasan metode Pembelajaran Praktik Produksi Dalam Rangka Link & Match,” Pros. Semin. Has. Penelit. dan Pengabdi. Masy. Polines, pp. 1008–1018, 2020, [Online]. Available: https://jurnal.polines.ac.id/index.php/Sentrikom/article/download/2698/107490.

E. Supriyanto, “Manufaktur Dalam Dunia Teknik Industri,” J. Ind. Elektro dan Penerbangan, Vol. 3, No. 3, p. 1, 2020.

O. S. Produksi, “Operasi Manufaktur Overview,” Vol. 7, pp. 1–11. 2011.

T. Y. T. Kusuma dan M. F. S. Firdaus, “Penentuan Jumlah Tenaga Kerja Optimal untuk Peningkatan Produktifitas Kerja (Studi Kasus: UD. Rekayasa Wangdi W),” Integr. Lab J., Vol. 7, No. 2, pp. 26–36, 2019.