The Use of Genetic Algorithms to Determine the Optimum Duration of the Construction Project of the Gedung Fakultas Ilmu Kesehatan, Brawijaya University, Malang
Penggunaan Algoritma Genetika Untuk Penentuan Durasi Optimum Pada Proyek Pembangunan Gedung Fakultas Ilmu Kesehatan Universitas Brawijaya Malang
DOI:
https://doi.org/10.26740/proteksi.v7n2.p112-118Keywords:
Genetic Algorithm, Precedence Diagram Method, optimum durationAbstract
Genetic algorithms are used to determine the best duration for each activity in the project so as to produce the optimum duration, namely the project duration that produces the minimum total project cost. This study determine the optimum project duration and the minimum Total Project Cost in the Faculty of Health Sciences Building Construction project, Brawijaya University. Secondary data were obtained from PT Citra Mandiri Cipta as the contractor. The initial population is formed from 16 chromosomes, each chromosome contains 57 genes, each gene contains data on the duration of each activity obtained randomly. Each chromosome provides information about the duration and total cost of the project using the PDM calculation. The relationship between fitness and total project cost is that the lower the total project cost, the greater the fitness value. To produce a better fitness value, crossover and mutation are carried out in each cycle (generation). After 500 generations of repetition, the optimum duration was obtained at 238 days and the total project cost was Rp 36,653,132,882.00, resulting in cost savings of Rp22,397,054 and a duration acceleration of 7 days. The total project cost and optimum duration with the Time Cost Trade Off calculation gave the same results.
References
Abdy, Muhammad. Wahyuni, Sari, Maya. Ilmi, Nur. 2016. “Algoritma Genetika dan Penerapannya dalam Mencari Akar Persamaan Polinomial”, Jurnal Saintifik, Vol.2 No.1, Januari.
Andriyadi, Anggi. Halimah, Yuliawati, Dona. Saleh, Sushanty. 2022. “Penerapan Algoritma Genetika Untuk Penjadwalan Sidang Dan Seminar IIB Darmajaya”, Prosiding Seminar Nasional Darmajaya, vol. 1, Agustus
Bakhtiar, Yusuf, Muhammad. 2020. “Klasifikasi Penelitian Dosen Menggunakan Naïve Bayes Classifier Dan Algoritma Genetika”, STRING (Satuan Tulisan Riset dan Inovasi Teknologi), Vol. 5 No. 2, Desember.
Christian, Andreas. Sujaini, Herry. Negara, Putra, Bijaksana, Arif. 2017. “Implementasi Sistem Penjadwalan Akademik Fakultas Teknik Universitas Tanjungpura Menggunakan Metode Algoritma Genetika”, Jurnal Sistem dan Teknologi Informasi, Vol. 5, No. 2.
Hasan, Umar. Hermanto, TI. Muttaqin, MR. 2018. Penjadwalan Mata Kuliah Menggunakan Algoritma Genetika Di STT Wastukancana Purwakarta, Jurnal Teknologi dan Informasi, Vol. 8 No. 2, September
Khaidir, I. Ayu, E.S. Andriani, D.P.A. 2022. “Implementasi Metode Precedence Diagram Method (PDM) Dalam Pengendalian Proyek Konstruksi”, Jurnal REKAYASA, Vol. 12. No. 02, Desember
Marbun, VV. Gawei, A.B.P. Puspasari, V.P. 2023. “Penjadwalan Proyek Pada Pembangunan Puskesmas Kota Besi”, Jurnal Teknika: Jurnal Teoritis dan Terapan Bidang Keteknikan, Vol.6 No. 2, April.
Mayyani, H. Nurbaiti, M. Supriyo, P.T. Aman, A. Silalahi, B.P. 2023. “Penerapan Algoritma Genetika Dengan Metode Roulette Wheel Dan Replacement Pada Masalah Memaksimumkan Omzet”, Journal of Mathematics and Its Applications JMA, Vol. 19 No. 2, Desember
Naniek Widyastuti, Amir Hamzah. 2007 “Peningkatan Kinerja Fuzzy Clustering Untuk Pengenalan Pola”, Berkala Ilmiah MIPA, Vol. 17 No. 2 Mei.
Nazarius,A. Pratama, R.D. Soebagijo, RA. Priskila, R. Pranatawijaya, V.H. 2024. “Pengimplementasian Algoritma Genetika Dalam Sistem Penjadwalan Praktikum”, JATI (Jurnal Mahasiswa Teknik Informatika), Vol. 8 No. 3, Juni.
Nuciferani, F.T. Aulady, M.F.N. Wibowo, P.A. 2019. “Pengurangan Risiko Pinalti Dengan Time Cost Trade Off Pada Proyek Konstruksi”. Jurnal Qua Teknika, Vol. 9 No. 2, September
Pangestu, Aji, Lintang. Suryawan, Harits, Sayekti. Latipah, Johar, Asslia. 2023. “Penerapan Algoritma Genetika Dalam Penjadwalan Mata Pelajaran”, Jurnal Informatika, Vol. 10 No. 2 Oktober
Rahayu, S. Nurwan, dan Wungguli, D. 2022. “Analisis Critical Path Method Dan Time Cost Trade Off Dalam Optimasi Waktu Dan Biaya Pengerjaan Proyek Pembangunan Rumah Sakit”, Jurnal Ilmiah Matematika dan Terapan, Vol. 19 No. 2, Desember
Safitri, E. Basriati, S. Hanum, L. 2019. “Optimasi Penjadwalan Proyek menggunakan CPM dan PDM (Studi Kasus: Pembangunan Gedung Balai Nikah dan Manasik Haji KUA Kecamatan Kateman Kabupaten Indragiri Hilir)”, Jurnal Sains Matematika dan Statistika, Vol. 5 No. 2, Juli.
Setiawan, Yaputra, Jessen. Herwindiati, Erny, Dyah. Sutrisno, Tri. 2019. “Algoritma Genetika Dengan Roulette Wheel Selection Dan Arithmetic Crossover Untuk Pengelompokan”, Jurnal Ilmu Komputer Dan Sistem Informasi, Vol. 7 No. 1, Januari.
Shita, R.T. Subandi. 2017. “Implementasi Algoritma Genetika Pada Aplikasi Pemetaan Distribusi Barang Berbasis Web”, Jurnal TELEMATIKA MKOM, Vol. 9 No. 3, November
Sunatha, I.G.N. Lestari, I.G.A.A.I. Soneta, YA. 2021. “Analisis Optimalisasi Waktu Kegiatan Pada Proyek Pembangunan Gedung C SMPN 14 Denpasar Dengan Microsoft Project 2007”. 2021. Jurnal Ilmiah Kurva Teknik Vol. 10, No. 2, November
Suryaputra, Judah. Lubis, Chairisni. Sutrisno, Tri. 2018. “Pemilihan crossover pada algoritma genetika untuk program aplikasi pengenalan karakter tulisan tangan”, Jurnal Ilmu Komputer Dan Sistem Informasi, vol. 6 No. 1, Januari
Zukhri, Zainudin. 2014. “Algoritma Genetika Metode Komputasi Evalusioner Untuk Menyelesaikan Masalah Optimasi”, C.V. ANDI OFFSET, Yogyakarta
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Achmad Yulianto, Eko Prasetyo

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Abstract views: 1
,
PDF Downloads: 5