IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI
Labor Productivity Identification for Budget Cost Optimization in Small-Scale Project Implementation in Bali
DOI:
https://doi.org/10.26740/proteksi.v6n2.p171-176Keywords:
labor productivity, identification, construction projects in BaliAbstract
The implementation of a construction project is highly dependent on the availability of labor which is the main driving force in the planning stage until the realization of the project. Without labor, it is impossible to achieve the goals of the project itself. The workability of the workforce is usually called productivity. One thing closely related to labor productivity is the cost of project implementation. The higher the productivity, the smaller the possibility of excess/inflation of project implementation costs, and vice versa. Based on this, further research is needed to determine the factors influencing labor productivity in implementing small-scale construction projects in Bali. Problem-solving and data analysis in this study used the Analytical Hierarchy Process (AHP) method. The results of the study showed that the most influential factors in labor productivity in project implementation were labor skills in carrying out work in the field (14.5%), equipment used during work (12.8%), the physical condition of workers (11.4%), job and work instructions given by superiors (11.3%), time schedule or work implementation time (10.5%), coordination between workers (10.2%), worker discipline during work or project implementation (10.1%), available materials (9.9%), and the last was the workspace or space available in carrying a job (9.4%).
References
Herjanto, E. (2007). Manajemen Operasi. Jakarta: Grasindo.
Hernandi, Y., & Tamtana, S. (2020). Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstrksi Gedung Bertingkat. Jurnal Mitra Teknik Sipil, 3(2), 299-312.
Kevin, Y., & Sulistio, H. (2018). Pengaruh Produktivitas Terhadap Biaya Pekerjaan Fabrikasi Besi Proyek Indonesia 1 Dengan Metode Crew Balance Chart. Jurnal Mitra Teknik Sipil, 61-70.
Laksmi, I. A. (2019). Faktor Sukses Penerbitan IMB di Kabupaten Gianyar, Bali. Jurnal Spektran Vol. 7, No 2, 195-203.
Laksmi, I. C. (2023). Identifikasi Fakor yang Mempengaruhi Biaya-Biaya dalam Pelaksanaan Proyek Skala Kecil di Bali. Denpasar: Universitas Warmadewa.
Laksmi, I. V. (2022). Faktor dan Metode Estimasi Biaya Proyek Selama Masa Pandemi Covid-19 Pada Pelaksana Jasa Konstruksi Skala Kecil di Bali. Denpasar: Lembaga Penelitian Universitas Warmadewa.
Monica Tanskanovia Magna, Widi Hartono, & Sugiyarto. (2017). ANALISIS RISIKO KONSTRUKSI STRUKTUR BORE PILE PADA PROYEK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). Jurnal MATRIKS TEKNIK SIPIL, 598-604.
Ningsih, S. (2024). Pengaruh Teknologi Terhadap Produktivitas Tenaga Kerja di Indonesia. BENEFIT: Journal Of Business, Economics, And Finance, 2(1), 1-9.
Herjanto, E. (2007). Manajemen Operasi. Jakarta: Grasindo.
Hernandi, Y., & Tamtana, S. (2020). Faktor-Faktor yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstrksi Gedung Bertingkat. Jurnal Mitra Teknik Sipil, 3(2), 299-312.
Kevin, Y., & Sulistio, H. (2018). Pengaruh Produktivitas Terhadap Biaya Pekerjaan Fabrikasi Besi Proyek Indonesia 1 Dengan Metode Crew Balance Chart. Jurnal Mitra Teknik Sipil, 61-70.
Laksmi, I. A. (2019). Faktor Sukses Penerbitan IMB di Kabupaten Gianyar, Bali. Jurnal Spektran Vol. 7, No 2, 195-203.
Laksmi, I. C. (2023). Identifikasi Fakor yang Mempengaruhi Biaya-Biaya dalam Pelaksanaan Proyek Skala Kecil di Bali. Denpasar: Universitas Warmadewa.
Laksmi, I. V. (2022). Faktor dan Metode Estimasi Biaya Proyek Selama Masa Pandemi Covid-19 Pada Pelaksana Jasa Konstruksi Skala Kecil di Bali. Denpasar: Lembaga Penelitian Universitas Warmadewa.
Monica Tanskanovia Magna, Widi Hartono, & Sugiyarto. (2017). ANALISIS RISIKO KONSTRUKSI STRUKTUR BORE PILE PADA PROYEK DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP). Jurnal MATRIKS TEKNIK SIPIL, 598-604.
Ningsih, S. (2024). Pengaruh Teknologi Terhadap Produktivitas Tenaga Kerja di Indonesia. BENEFIT: Journal Of Business, Economics, And Finance, 2(1), 1-9.
Parengkuan, E. (2019). Produktivitas Kerja yang dilihat dari Faktor Usia dan Pengalaman Kerja. Jurnal Manajemen, 02(02), 145-153.
Sean A.M.Pebakirang, Agung Sutrisno, & Johan Neyland. (2017). Penerapan Metode Ahp (Analytical Hierarchy Process) Untuk Pemilihan Supplier Suku Cadang Di Pltd Bitung. Jurnal Online Poros Teknik Mesin Volume 6 Nomor 1, 32-44.
Sumadi, I. E., Wiranata, A., & Asmara, A. A. (2016). Analisis Faktor Yang Mempengaruhi Pebengkakan Biaya Konstruksi (Cost Overrun) Dengan Metode Analytical Hierarchy Process (AHP) Pada Proyek Konstruksi Di Kota Denpasar dan Kabupaten Badung. Jurnal Ilmiah Teknik Sipil • A Scientific Journal Of Civil Engineering Vol. 20 No. 1 Januari 2016, 66-71.
Suyatno. (2010). Analisis Faktor Penyebab Keterlambatan Penyelesaian Proyek Gedung (Aplikasi Model Regresi). Semarang: Universitas Diponegoro.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Vinantya Laksmi Ida Ayu Cri

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

