This study examines the comparison of labor productivity during normal working hours and overtime in the ceramic installation work of the Transit Office renovation project of the Ministry of Finance in Balikpapan City.The main issue is how the value of labor productivity differs between normal working hours and overtime, and its impact on the decline in productivity and the increase in wage costs.The research method was conducted through direct observation in the field over 10 days during normal working hours (08:00–16:00) and overtime hours (19:00–22:00), focusing on the productivity of ceramic workers using 60cmx60cm ceramic tiles.The research results show a significant difference in labor productivity between normal working hours and overtime, where productivity during overtime decreases due to fatigue, which also leads to an increase in labor wage costs.In conclusion, although overtime can accelerate project completion in the short term, the implementation of overtime hours in the long term negatively impacts productivity and cost efficiency. Therefore, proper management of overtime hours is necessary to maintain a balance between time, cost, and quality in construction projects.

References

Alfianarrochmah, M. (2018). Pengaruh metode kerja terhadap produktivitas tukang pada pekerjaan pemasangan keramik lantai. Jurnal Teknik Sipil, 7(1), 45–51.

Badan Pusat Statistik. (2020). Hasil Sensus Penduduk 2020 - DKI Jakarta. Jakarta: Badan Pusat Statistik.

Ervianto, W. I. (2002). Manajemen proyek konstruksi (Edisi Revisi). Yogyakarta: Andi.

Hutasoit, P. J., et al. (2017). Analisis produktivitas tenaga kerja konstruksi pada pekerjaan pasangan lantai keramik dan plesteran dinding menggunakan metode work sampling (Studi kasus: Bangunan gedung pendidikan Fakultas Kedokteran). Jurnal Sipil Statik, 5(4), Universitas Sam Ratulangi Manado.

Nugroho, A. (2021). Studi produktivitas tukang pada pekerjaan pemasangan keramik lantai menggunakan metode work sampling. Jurnal Konstruksi, 10(2), 101–110.

Oglesby, C. H., Parker, H. W., & Howell, G. A. (1989). Productivity improvement in construction. New York: McGraw-Hill.

Ongkojoyo, K. F., Giovanno, R., & Nugraha, P. (2022). Perbandingan angka produktivitas pemasangan keramik lantai dan plafon. Jurnal Teknik Sipil Petra, 10(2), 95–104.

Permen PUPR No. 28/PRT/M/2016. (2016). Analisis harga satuan pekerjaan bidang pekerjaan umum dan perumahan rakyat. Jakarta: Kementerian PUPR.

Rohim, M., et al. (2025). Analisis produktivitas tukang pada pekerjaan pemasangan keramik lantai. Jurnal Surya Beton, 9(1), 12–22.

Sinungan, M. (2018). Produktivitas: Apa dan bagaimana. Jakarta: Bumi Aksara.

Siregar, R. (2020). Pengaruh faktor lingkungan kerja terhadap produktivitas tukang pada proyek konstruksi. Jurnal Teknik Sipil, 19(1), 55–62.

Supriyadi, A. (2019). Pengaruh ketersediaan material terhadap produktivitas tenaga kerja pada proyek konstruksi. Jurnal Rekayasa Sipil, 8(3), 215–222.

Suryani, D. (2022). Faktor-faktor yang mempengaruhi produktivitas tenaga kerja pada pemasangan keramik lantai. Jurnal Teknik Sipil dan Lingkungan, 11(1), 33–40.

Thenu, G., Taihuttu, F., & Kempa, M. (2019). Analisis produktivitas tenaga kerja terhadap pekerjaan keramik pada pandemi Covid-19. Jurnal Simetrik, 9(2), 208–214.

Yuliana, D. (2023). Strategi peningkatan produktivitas tukang dalam pekerjaan pemasangan keramik lantai. Jurnal Manajemen Konstruksi, 5(2), 88–97.