Mvondo, F. F., Wounba, J. F. and Nkeng, G. E. (2026) “Development of an AHP-Based Multi-criteria Decision Model for prioritizing Road-Related Infrastructure in Cameroon: Case Studies of Bogo-Guirvidig and Bingambo-Grandzambi projects”, Vokasi Unesa Bulletin of Engineering, Technology and Applied Science, 3(1), pp. 129–152. doi: 10.26740/vubeta.v3i1.42330.