Mvondo, F. F., Wounba, J. F., & Nkeng, G. E. (2026). Development of an AHP-Based Multi-criteria Decision Model for prioritizing Road-Related Infrastructure in Cameroon: Case Studies of Bogo-Guirvidig and Bingambo-Grandzambi projects. Vokasi Unesa Bulletin of Engineering, Technology and Applied Science, 3(1), 129–152. https://doi.org/10.26740/vubeta.v3i1.42330